Jiangyin Golden Machinery Equipment Co , Ltd

Home ProductsHydraulic Cylinder Piston Rod

Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods

Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods

  • Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods
  • Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods
  • Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods
  • Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods
  • Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods
  • Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods
Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods
Product Details:
Place of Origin: Jiangsu
Brand Name: Golden
Certification: ISO9001,UL,CE
Model Number: Customized
Payment & Shipping Terms:
Minimum Order Quantity: 1 pc
Price: 30usd to 2500usd
Packaging Details: Box Or Wooden Package
Delivery Time: 7-25 working days
Payment Terms: L/C, T/T, Paypal
Supply Ability: 3000 tons/month
Contact Now
Detailed Product Description
Type: Hydraulic Power Units Material: SAE1045 CK45
Application: Machinery Size: Custom Made
Name: Hydraulic Flow Divider Process: Forging+Machining(if Need)+surface Treatment
High Light:

SAE1045 Hydraulic Cylinder Piston Rod

,

Din1.1191 Hydraulic Cylinder Piston Rod

,

C45e Cylinder Piston Rod

Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods 0 Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods 1 Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods 2

Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods

Detailed Description:
1) Product Name: Forged Shaft, Shaft Forging
2) Material: 4130, 4140, 4317, 4142, 4340, UNS440, 34CrNi3Mo, 25Cr2Ni4MoV, 18CrNiMo5, 30CrMo, 9Cr2Mo, 9Cr2W, 9Cr3Mo, 60CrMoV etc.
3) Max weight: 60ton.
4) MOQ: 20ton.
5) FOB Port: Shanghai Port, China.
6) Delivery Time: 60ton in 30 days.
7) Delivery Condition: Rough Machined, Heat Treated, Fine Machined + EN10204: 3.1B
8) Payment: 30% T/T in advance, Balanced C. A. D.; Or 100% L/C.
***
Packaging & Delivery
Packaging Details:Delivery Detail:

wooden or steel package seaworthy packing
about 35 days from order or as per customer requirement
Item Process Facility

 

Inspection items

 

Standard

01
Steel material
inspection
  Chemical composition
(EF+LF+VD)
Material standard
  surface Ingot inspection
specification
  Ingot type and weight Material standard
02 Material
store
  Division put warehouse management
1 Heat Heat furnace Temperature/Time Heating process
specification
Forging production
procedure
2
Forging Press Reduction ratio,forging
temperature,deformation,
Surface and dimensions
Forging process card
Forging procedure
3
Heat treatment heat treatment
furnace
heat treatment charts 1st heat-treatment card
Forging procedure
4
Rough
inspection
  Dimensions, apperance,
Mark
Inspection specification
Forging procedure
5
Rough UT UT equipment Single defect, concentrated
Defects bottom wave
attenuation
UT standard or
customer's technical
requirements
6
Saw cutting Saw machine Dimension IQC and forging
7
rough turning turning-lathe Dimension,appearance Rough machining
drawing
8
UT UT equipment Single defect, concentrated
defects bottom wave attenuation
UT standard or
customer's technical
requirements
9
Q+T
heat treatment
heat treatment
furnace
heat treatment charts Heating process
specification
10
Sampling or machining machining tool rough machining drawing
sampling drawing
sample machining
drawing
11
mechanical
property test
tensile testing machine/
impact testing machine
ambient temperature,humidity,
Test temp.Sample dimension,
test method
Standard
technical specification
12
finish
machining
machining
tool
Dimension,appearance finish machining drawing
13
UT UT equipment Single defect, concentrated
Defects bottom wave
attenuation
UT standard or
customer's technical
requirements
14
MT MT equipment Magnetic particle
indication
Test standard or
Technical requirements
15
Mark Steel seal marking content Product standard
Technical requirements
Forging process
16
Final
inspection
  Appearance, dimension, mark
acceptance inspection
Product inspection
specification
Product standard
P.O.
17 Protection/
package
Blasting
Blasting equipment
appearance
coating thickness
Product standard
Technical requirements

 

Mill Frequently Used Steel Materials:
1) Wind Power Shaft: 42CrMo4V, 34CrNiMo6; Wind Power Flange: S355NL, C22, 16Mn, 20Mn, 42CrMo, F304.
2) Forged Pipe Fittings: SA106 CL B, SA106 CL C, WB36, 12Cr1MoV, SA335 P11, P12, P22, P91, SA182 Gr. F1, Gr. F5, Gr. F11 CL2, Gr. F12 CL2, Gr. F22 CL3, SA350 Gr. LF1, Gr. LF2,
Gr. LF3.
3) Pressure Vessel Forgings: SA105, SA350 LF2, 16Mn, 20MnMo, 15MnMo, 12Cr2Mo1, 14Cr1Mo, F304, F316, 17-4PH.
4) Shaft Related Forgings: 25CrMo4, 42CrMo4, 40CrNiMo, 34CrNi3Mo, 25Cr2Ni4MoV, 18CrNiMo5, 30CrMo, 4130, 4140.
5) Gear Related Forgings: 35CrMo, 34CrMo4, 4137, 42CrMo, 4140, SCM440, 20CrMnMo, 40CrNiMo, 20CrNi2Mo, 20Cr2Ni4A, 34CrNi3Mo.
6) Copper Forgings: C10100, C10200, C10300, C10700, C12000, C12200.

Forging Production Flow
Enquiry With Drawing In Details
Confirm Steel Material, Chemical Compositions, Mechanical Properties, Tolerances
Confirm Payment Terms, Order Materials or Check Material in Stock
Check Material Chemical Compositions, Material Weight, Dimensions
Cut Materials, Record Weight, Pre-Heating For Forging
Forging Ratios, Heat Treatment After Forging, Dimension Check
Rough Machining, UT Test, Heat Treatment
Fine Machining, UT & PT Test, Dimensions Inspection, Mechanical Properties Test
Customer Inspection at Site, Packing, Delivery Arrangement
Balance Payment Confirmation, Dispatch Forgings or Castings
Bill of Loading Confirmation, MTC Dispatch, Customs Clearances
Order Accomplished
Prime Quality Sae1045 Din1.1191 C45 Hydraulic Cylinder Piston Rods 3

Contact Details
Jiangyin Golden Machinery Equipment Co , Ltd

Contact Person: admin

Tel: +8613646165906

Send your inquiry directly to us
Other Products